# Opening of the Baku–Batumi Kerosene Pipeline (July 1907)

URL: https://allhistories.com/georgia/timeline/1907-opening-of-the-baku-batumi-kerosene-pipeline
Location: Batumi
Themes: Bolsheviks, Political violence

The Baku–Batumi kerosene pipeline was opened officially in July 1907, after the first section was finished in 1906. It carried refined oil from Baku to Batumi on the Black Sea, with sources giving its length as 863 or 885 km and its capacity as roughly 960,000–980,000 tons a year, with 16 pumping stations in the original design. The chemist Dmitri Mendeleev proposed it in 1880, Vladimir Shukhov drafted the plan in 1884 and designed the technical project, and the State Council approved it in 1896. The railway had reached Baku in 1883, but a pipeline offered a cheaper way to move refined oil to the sea. Batumi became a principal export port for Caspian oil. The line was rebuilt as a crude-oil pipeline in 1928–1930, and parts of the route were reused for the Baku–Supsa pipeline in the 1990s. Georgia has remained an energy corridor since. The Georgian Encyclopedia describes it as one of the first and oldest oil pipelines in the South Caucasus. At this point in the timeline (1907), Georgia, then within the Russian Empire under Emperor Nicholas II of Russia (1 November 1894 – 15 March 1917), was administered by Illarion Vorontsov-Dashkov, viceroy of the Caucasus (11 March 1905 – 5 September 1915).

## Why it matters
It made Batumi a key oil terminal and began Georgia's role as a transit route for Caspian energy.

Ruler at the Time: [Illarion Vorontsov-Dashkov](https://allhistories.com/georgia/rulers/illarion-vorontsov-dashkov)

## Sources
- [Wikipedia — Baku–Batumi pipeline](https://en.wikipedia.org/wiki/Baku–Batumi_pipeline)
- [Georgian Encyclopedia — Baku–Batumi Pipeline](https://georgianencyclopedia.ge/en/form_eng/408)

